Milestone 5 - Inspection

Your Project Has Moved To Inspection!

Learn everything you need to know in this 2 min video about this stage of your project!
Get all your FAQ answered and understand any action items we may need your help with!
loadimage (5)
Inspection

Where You Are At In Your Project

With your panels and inverter now installed, your system needs to be inspected by the city or county that issued your permit.  They will check to make sure the system is safe to operate, that we followed all local codes and that the system we built matches the designs we submitted to get the permit.

 

 

loadimage (3)-1
Inspection

What You Need To Know About This Stage

We have a very high pass rate on inspections of systems we build however we do occasionally have a few corrections we need make in order for the system to pass.  We will promptly address any corrections and arrange for a follow up. 

Inspection

Your Action Items

You may need to be home for the inspection

We will coordinate with you if you are needed home during the inspection.

We Partner With

Why Skyline

Just in case you didn't know this awesome stuff about us!

power-1

On Time

On Time

Your system will be installed in 120 days*!
As part of our On Time On Budget guarantee, we will take care of your monthly solar payments if your system isn't operational within 120 days from when it was site surveyed.

*150 Days for MidAmerican, Alliant and Holy Cross Customers.

dollar-1

On Budget

On Budget

Never pay more than what you signed up for.
On Time On Budget guarantee covers your back against any costs we incur that were NOT included in the contract. In other words, we won't come back to you later in the project and ask for more money. This happens on 1 out of every 8 projects and is a value of $1,500 on average to you!
11-1

Give Power

Give Power

Clean drinking water for 20 years!
When your install is completed, a donation will be made to
Give Power foundation so that one individual will receive enough clean drinking water for 20 years!
tick

One Stop Shop

One Stop Shop

Everything done all in house, no cut corners.
Financing, Survey, Design, Electrical, Project Management, Monitoring. All your solar needs under one roof with w2 employees and local installers.
Inspection Icon

Inspection

Inspection

The new solar system is inspected to ensure it is compliant with all local codes and regulations.  Any corrections required will be promptly addressed.

Net Metering Icon

Net Metering

Net Metering

The local power utility will go through their procedures for the net metering agreement including possibly replacing the electric meter.

System On Icon

System On

System On

With all processes complete, the system is ready to be turned on when it will immediately begin producing clean solar power!

System-On-Icon-stage

Stage Completed

Stage Completed

Check Out the stages you've already completed!
Site Survey Icon

SITE Survey

SITE Survey

A Solar Technician comes to the home to take measurements of relevant areas of the home and take pictures for the final design of the system.

Design Icon

Final Design

Final Design

A Designer will create a design of the solar array using a CAD program.  The design is approved by an engineer.
NMA & Permitting Icon

Permits & Net Metering Agreement

Permits & Net Metering Agreement

The Skyline Solar Team will apply for all necessary building permits for the city or county. They will also apply for a net metering agreement with the local power utility.
Installation Icon

Installation

Installation

At the scheduled date and time, a Skyline Solar crew will put the solar panels on the property along with all other equipment for the system.

FAQs

Most Asked Questions During This Stage.

How long will my project take?

Great Question!  We guarantee that your system will be operational within 120 days following your site survey, 150 days for MidAmerican, Alliant and Holy Cross customers.  If we are not able to make our deadline, we will take care of your monthly solar payments for you!

 

How long until this stage is complete?

Scheduling an inspector can take up to 2 weeks.  An inspection takes less than an hour.  Although we have a very high pass rate on our inspections, there may be a list of corrections we need to make.  The inspection acts as an independent check to ensure your system meets local building codes and ordinances.

Why would my system not pass an inspection?

Here at Skyline, we work in a variety of cities and counties and within each of those areas our solar projects are checked by several inspectors.  Each factor of different areas and inspectors add a level and complexity and nuance to codes and ordinances with differing interpretations.  

How can I submit a referral?

We always aim to please and always roll out the red carpet for those referred to us.  You can quickly and easily submit a referral HERE.  We can't wait to serve your friends and neighbors!

IMG_7851

Fill out the form below and create a ticket.